A. Filter

Culture & sport · Parametric

London Aquatics Centre

2011

Key featuresA wave-shaped steel roof spans the pools on only three supports, lined underneath in timber.

About the building

Pritzker Prize winner Zaha Hadid designed the London Aquatics Centre in 2004, before London had secured the 2012 Summer Olympics. It sits in Stratford, inside Queen Elizabeth Olympic Park, and contains two 50-metre pools for swimming and one of 25 metres for diving. Since the design predated the successful bid, it had no spectator wings at first; these were added later to fit the expected audience, and during the Games it held 17,500. The 3,200-tonne roof is steel, the ceiling is made from 30,000 pieces of Red Louro wood, and 462 tonnes of concrete went into the six-board diving platform. The centre was finished in July 2011 at a final cost of £269 million. With the two temporary wings since removed, it seats 2,800 as standard, plus 1,000 extra for major events. Its public opening came on 1 March 2014.

Sources: London Aquatics Centre (Wikipedia)

More by Zaha HadidAll 38 →

More with structure as expressionAll 668 →

Find more with

Structure as expression668 buildings →Sculptural form769 buildings →Timber229 buildings →Culture & sport614 buildings →

Each opens every building that shares the idea.

Details

Architect
Zaha Hadid
Place
London, United Kingdom
Year
2011
Typology
Culture & sport
Movement
Parametric
Region
Europe

Go deeper

More · Culture & sportAll 614 →

See it on the wall

Portrait: Columbia GSAPP · CC BY 2.0 · source

About London Aquatics Centre

The London Aquatics Centre is an indoor facility with two 50-metre (164-foot) swimming pools and a 25-metre (82-foot) diving pool in Queen Elizabeth Olympic Park in Stratford, London. The centre, designed by architect Zaha Hadid as one of the main venues of the 2012 Summer Olympics and Paralympics, was used for the swimming, diving and synchronised swimming events. After significant modification, the centre opened to the public in March 2014.

The centre was designed by Pritzker Prize-winning architect Zaha Hadid in 2004 before London won the bid for the 2012 Summer Olympics. It was built alongside the Water Polo Arena and opposite the Olympic Stadium on the opposite bank of the Waterworks River. The site is 45 metres (148 feet) high, 160 metres (520 feet) long, and 80 metres (260 feet) wide. The wave-like roof is stated to be 11,200 square feet (1,040 m2), a reduction from the previously stated 35,000 square feet (3,300 m2).

Shortened from Wikipedia, CC BY-SA 4.0.

NextKAFD Metro Station