1/6 · ExteriorPhoto: Dietmar Rabich · CC BY-SA 4.0 · source2/6 · Exterior · Seating at Singapore National StadiumPhoto: Exec8 · CC BY-SA 4.0 · source3/6 · Exterior · Taken from Kallang Riverside Park looking towards the National StadiumPhoto: Mike Cartmell from Singapore, Singapore · CC BY 2.0 · source4/6 · ExteriorPhoto: Asalover2004 · CC BY-SA 4.0 · source5/6 · Interior · Taken in 2023 during evening of one of the public viewing sessionsPhoto: Robertsky · CC BY-SA 4.0 · source6/6 · Interior · Inside the Singapore National StadiumPhoto: Exec8 · CC BY-SA 4.0 · source
Key featuresThin steel dome spanning the whole bowl, with a retractable roof that slides shut for shade.
About the building
The National Stadium in Singapore opened in 2014 on the site of the earlier National Stadium, which stood from 1973 to 2010. Arup, DP Architects and AECOM designed it within a 35-hectare Sports Hub masterplan. The 55,000-seat venue sits under a steel dome 83 m tall and 75,000 m2 in area, among the largest domed structures anywhere, with a retractable roof. It relies on natural ventilation, and its insulated metal roof reflects the sun; rather than cooling the whole bowl, it feeds cool air to the seats, making pockets of comfort around spectators and saving energy. For football and rugby the lowest tier moves forward over the running track, a change of about 48 hours, and LED lighting lets the roof act as a large screen. It is a useful study in designing for a tropical climate.
Portrait: Tim Green from Bradford · CC BY 2.0 · source
About National Stadium, Singapore
The Singapore National Stadium is a multi-purpose stadium in Kallang, Singapore, and serves as the country's national stadium. Opened in 2014, it was built on the site of the former National Stadium, which stood from 1973 to 2010. The 55,000-seat facility is the centrepiece of The Kallang, a sports, entertainment and recreation district that also includes the nearby Singapore Indoor Stadium, OCBC Aquatic Centre, OCBC Arena, Kallang Wave Mall and other public sporting facilities.
The stadium features a 75,000 m2 (810,000 sq ft), 83 m (272 ft)-tall steel dome with a retractable roof, which was described as the largest dome structure in the world. Because of Singapore's tropical climate, the roof is designed to reflect sunlight and insulate the interior, while natural airflow cools spectator areas with less energy than a venue of comparable size.
The stadium can be configured for football, rugby, athletics and cricket. In its football and rugby configuration, the lowest tier of seating can be moved closer to the pitch, covering the running track. It takes approximately 48 hours to reconfigure the seating for an event.
The retractable roof incorporates an LED lighting system that can function as a large screen visible from inside and outside the stadium.