1/7 · Exterior · Beijing, China: National Stadium, also known als "birds nest"Photo: CEphoto, Uwe Aranas · CC BY-SA 3.0 · source2/7 · ExteriorPhoto: Arne Müseler · CC BY-SA 3.0 de · source3/7 · Exterior · Beijing, China: National Stadium, also known als "birds nest"Photo: CEphoto, Uwe Aranas · CC BY-SA 3.0 · source4/7 · Exterior · Exterior view of the Beijing National StadiumPhoto: Balon Greyjoy · CC0 · source5/7 · Detail · Beijing, China: Detail of the roof of the National Stadium, also known als "birds nest"Photo: CEphoto, Uwe Aranas · CC BY-SA 3.0 · source6/7 · Context · Ground viewPhoto: N509FZ · CC BY-SA 4.0 · source7/7 · ModelPhoto: Ank Kumar · CC BY-SA 4.0 · source
The National Stadium (国家体育场, Guójiā Tǐyùchǎng), a.k.a. the Bird's Nest (鸟巢), is a stadium at Olympic Green in Chaoyang, Beijing, China. The National Stadium, covering an area of 204,000 square meters with an 80,000 person capacity (91,000 with temporary seating), broke ground in December 2003, officially started construction in March 2004, and was completed in June 2008.
Beijing National Stadium (BNS) was a joint venture among architects Jacques Herzog and Pierre de Meuron of Herzog & de Meuron, project architect Stefan Marbach and CADG, which was led by chief architect Li Xinggang. During their first meeting in 2003, at Basel, the group decided to do something unlike Herzog and de Meuron had traditionally designed. "China wanted to have something new for this very important stadium," Li stated. In an effort to design a stadium that was "porous" while also being "a collective building, a public vessel", the team studied Chinese ceramics. This line of thought brought the team to the "nest scheme". The stadium consists of two independent structures, standing 50 feet apart: a red concrete seating bowl and the outer steel frame around it.