Education · Contemporary
UTEC University Campus
Key featuresA stepped concrete 'man-made cliff' of terraces and open-air platforms facing a ravine and the city.
About the building
UTEC, the University of Engineering and Technology, has its Lima campus where the Barranco District begins, between Reducto Avenue, the Bajada de Armendáriz and the Paseo de la República. Its designers, Yvonne Farrell and Shelley McNamara of the Irish practice Grafton Architects, won the UTEC competition and drew the scheme in 2011; Graña y Montero built it in 2015 with a construction budget of US$100 million. It sits on what was left of huaca La Viñita, Barranco's last pre-Columbian archaeological site, some 5,000 m² in size. The brutalist building won a Silver Lion at the 13th Venice Architecture Biennale and was among the works cited when Farrell and McNamara received the 2020 Pritzker Prize. Opinion is split: supporters call it a 'modern Machu Picchu', while critics attack its 'unfinished appearance' and liken it to buildings of Juan Velasco Alvarado's government.
Sources: Campus of the University of Engineering and Technology, Lima · University of Engineering and Technology (Peru) (Wikipedia)
More by Grafton ArchitectsAll 4 →
More with sectionAll 190 →
Find more with
Section190 buildings →Exposed concrete542 buildings →Climate response258 buildings →Education229 buildings →Each opens every building that shares the idea.
Details
- Place
- Lima, Peru
- Year
- 2015
- Typology
- Education
- Movement
- Contemporary
- Region
- Americas
Go deeper
See all 9 links
More · EducationAll 229 →
Portrait: Amor Vacui · CC BY 3.0 · source










