Infrastructure · Contemporary
Ben Gurion Airport Terminal 3
Key featuresTerminal 3 has 40 gates on four concourses; vertical surfaces are clad in Jerusalem stone.
About the building
Ben Gurion Airport's Terminal 3 was inaugurated on 28 October 2004, when Prime Minister Ariel Sharon spoke, and opened to passengers a month later, replacing Terminal 1 as Israel's main gateway. Skidmore, Owings & Merrill (SOM) designed the main building, while Moshe Safdie & Associates and TRA (today Black & Veatch) were responsible for a link building and the airside gates and departure areas. Hamid Kia, SOM's lead architect, aimed to capture the emotion of arriving in and leaving Israel. In Safdie's connector, arriving and departing passengers share one space and see each other through glass, with views to the Judean Hills and a garden of the Seven Species. An inverted dome hangs over the departures rotunda under a white fabric ceiling that softens daylight. Walls are faced in Jerusalem stone, set against white concrete, glass and aluminium.
Sources: Ben Gurion Airport (Wikipedia)
More by SOMAll 18 →
More with circulationAll 188 →
Find more with
Circulation188 buildings →Stone524 buildings →Steel & glass519 buildings →Infrastructure223 buildings →Each opens every building that shares the idea.
Details
- Architect
- Skidmore, Owings & Merrill
SOM: all buildings - Place
- Lod, Israel
- Year
- 2004
- Typology
- Infrastructure
- Movement
- Contemporary
- Region
- Middle East









