A. Filter

Workplace · Deconstructivism

Vitra Fire Station

1993

Key featuresZaha Hadid's first built work: sharp concrete planes caught in motion.

More by Zaha HadidAll 38 →

More with sculptural formAll 769 →

Find more with

Sculptural form769 buildings →Exposed concrete542 buildings →Cantilever180 buildings →Workplace163 buildings →

Each opens every building that shares the idea.

Details

Architect
Zaha Hadid
Place
Weil am Rhein, Germany
Year
1993
Typology
Workplace
Movement
Deconstructivism
Region
Europe

Go deeper

More · WorkplaceAll 163 →

See it on the wall

Portrait: Columbia GSAPP · CC BY 2.0 · source

About Vitra Fire Station

The Vitra Fire Station is a concrete and steel building of 852 m2 (9,170 sq ft) located at the Vitra Furniture factory in Weil am Rhein, Germany. Completed in 1993, it was the first constructed project by Iraqi architect Zaha Hadid.

Architect Nicholas Grimshaw was hired to redesign of the damaged factory complex. His original proposal was a unified series of buildings. However, the company later chose to create a collection of buildings with varying styles. For the fire station, the company hired Zaha Hadid, whom it had been considering for the design of some of its furniture product line.

Shortened from Wikipedia, CC BY-SA 4.0.

NextKAFD Metro Station