1/6 · Exterior · Haupteingang des IG-Farben-Hauses/Pölzig-Baus der J.W.Goethe Universität Frankfurt am MainPhoto: Sith Cookie · CC BY-SA 3.0 · source2/6 · Exterior · The Poelzig-Bau , aka IG Farben Building, which today houses the University of Frankfurt am MainPhoto: DXR · CC BY-SA 3.0 · source3/6 · Exterior · The Poelzig-Bau , aka IG Farben Building, which today houses the University of Frankfurt am MainPhoto: DXR · CC BY-SA 3.0 · source4/6 · Exterior · Frankfurt am Main, I.GPhoto: DrKssn · CC BY-SA 4.0 · source5/6 · Interior · Corridor 1st floor above main entrance hall of the IG Farben buildingPhoto: Melkom · CC BY-SA 3.0 · source6/6 · Interior · Eisenhower room in the IG Farben buildingPhoto: Melkom · CC BY-SA 3.0 · source
Key featuresSix wings off a curved spine clad in travertine, served by paternoster lifts.
About the building
Hans Poelzig designed this Frankfurt headquarters for IG Farben in the New Objectivity style, and it was completed in 1931. It was the largest building put up in the Weimar Republic and stayed Europe's biggest office complex until the 1950s. The board picked Poelzig's scheme, a long, curved main block with six cross wings. The block runs 250 metres, its wings joined by a curved central corridor, so the offices get daylight and fresh air without the closed courtyards common in big office buildings of the time. Travertine faces the steel frame, and horizontal window bands stress the curve. After American forces took Frankfurt in March 1945, it housed Allied and American military administration. Dissing+Weitling won the competition to adapt it for university use, and it reopened on 26 October 2001 as the first major part of the Westend Campus.
Portrait: Alexander Binder · Public domain · source
About IG Farben Building
The IG Farben Building (German: IG Farben-Haus), also known as the Poelzig Building (Poelzig-Bau), is a building complex in Frankfurt, Germany. It is the central building of the Westend Campus of Goethe University Frankfurt. Designed by Hans Poelzig in the New Objectivity style and completed in 1931, it was built as the corporate headquarters of IG Farben. It was the largest building constructed in the Weimar Republic and remained Europe's largest office complex until the 1950s.
The main block is 250 metres long and consists of six wings connected by a gently curved central corridor. The arrangement brought daylight and ventilation to the offices while avoiding the enclosed courtyards common in large office buildings of the period. Its steel frame is faced with travertine, and horizontal window bands emphasise the curve of the façade. Poelzig's design combined monumental scale with the repetitive forms of industrial construction.