A. Filter

Infrastructure · Modernism

General Rafael Urdaneta Bridge

1962

Key featuresPrestressed concrete bridge over Lake Maracaibo, completed 1962.

About the building

A competition to design this crossing of Lake Maracaibo began in 1957. It was won by the Venezuelan civil engineers Juan Francisco Otaola Pavan and Oscar Benedetti, owners of Precomprimido C.A., with a design by the Italian civil engineer Riccardo Morandi. Of twelve entries theirs alone was in concrete, which was expected to cost less to maintain and to give Venezuela useful experience with prestressed concrete. The finished cable-stayed bridge, in reinforced and prestressed concrete, runs 8.678 kilometres (5.392 mi) from one shore to the other. Its five main spans each measure 235 metres and hang from towers 92 metres tall, leaving 46 metres of clear height above the water. President Romulo Betancourt opened it on 24 August 1962. In April 1964 the tanker Esso Maracaibo struck the bridge and sections of it fell, killing seven people.

Sources: General Rafael Urdaneta Bridge (Wikipedia)

More with structure as expressionAll 668 →

Find more with

Structure as expression668 buildings →Exposed concrete542 buildings →Water306 buildings →Infrastructure223 buildings →

Each opens every building that shares the idea.

Details

Architect
Riccardo Morandi
Place
Maracaibo, Venezuela
Year
1962
Typology
Infrastructure
Movement
Modernism
Region
Americas

Go deeper

More · InfrastructureAll 223 →

See it on the wall

Portrait: Dirsmith1 · CC BY-SA 4.0 · source

NextHassan II Bridge